Big Projects by Grupel: The Bobo Forro 2 power plant in São Tomé and Principe Islands

Big Projects by Grupel: The Bobo Forro 2 power plant in São Tomé and Principe Islands

Bobo Forro SÃO TOMÉ

The Bobô Forrô 2 power generation central in the islands of São Tomé and Principe was developed in 2015 with the objective of reinforcing the network of energy supply to the country.

Grupel supplied 2 diesel generators of 2000 kVA with 1500 RPM with 400V/30kV transformer. An auxiliary container with SCADA system and medium voltage cells together with a complete fuel treatment circuit was also supplied.

Resumee:

  • 2 diesel generators of 2000 Kva with 1500 RPM with 400V/30kV transformer;
  • Auxiliary container with SCADA system and medium voltage cells.