Big Projects Grupel

Grupel's energy empowers the cycling team Sporting CP / Tavira
Energia Grupel reforça a equipa Sporting CP/Tavira
Energia Grupel reforça a equipa Sporting CP/Tavira
Energia Grupel reforça a equipa Sporting CP/Tavira

Grupel’s energy empowers Sporting CP / Tavira cycling team

In keeping with Grupel's versatility and dynamics, and within the framework of the recently signed sponsoring partnership, we are pleased to announce the successfull installation of a stand-by-power diesel generator to support the Sporting CP / Tavira cycling team competing in A Volta a Portugal 2017, Portugal's most relevant cycling competition. Grupel carries out customized projects and solutions and offers a global service, from initial design, manufacturing, turnkey installation and finally, commissioning and monitoring. We work with dedicated software for assembly projects, including mechanical [...]

Grupel supplies energy to the ÉvoraShopping project

Grupel develops power generation solutions for the most diverse segments from which we highlight the civil construction, industrial, telecommunications, residential and commercial, petroleum, etc. In the commercial sector we feature here the successful implementation of two industrial generators with combined power of about 1000kVA for a reference project in the interior of Alentejo (Portugal). Grupel SA was thus the company selected, through an installation company, to supply the power generators that will serve the supplementary energy needs of the new [...]

Gerador diesel Grupel central termoeletrica
Gerador diesel Grupel central termoeletrica

Grupel Generator for a thermoelectric power plant in Venezuela

This month of May we highlight the implementation of a project in Venezuela for an international reference company in the engineering sector. The project consisted of a 906kVA (STP) Emergency Diesel Genset with MAN D 2842 LE 211 engine with and Leroy Somer LSA 49.1 M75 alternator in a 40” container. The genset is installed in a Thermoelectric Power Plant in Venezuela, for feeding the essential load that is required for protecting sensitive equipment of the plant in case of [...]

Proyecto Chase Farm Hospital Energy Centre
Proyecto Chase Farm Hospital Energy Centre

Chase Hospital Energy Centre Project – UK

The Chase Farm Hospital Project consisted on the supply of three generator sets on chassis for parallel operation in synchronism with the network. These generators must provide the electric power necessary for the operation of the hospital in case of an emergency (power failure) and are also enabled for STOR operation. As a solution to a timely electricity consumption demand above normal levels, "National Grid" in the United Kingdom introduced the Short Term Operating Reserve (STOR). With this model, you can [...]

Grupel big project: water treatment plant in Qatar
Grupel big project. Water treatment plant in Qatar
Grupel big project. Water treatment plant in Qatar
Grupel big project. Water treatment plant in Qatar

Case-study: water treatment plant in Qatar

Case study Water Treatment plant in Qatar Grupel S.A. highlights the excelent implementation in Qatar of a special project composed of a 2200kVA (STP) Emergency Diesel generator set equiped with a Perkins 4016-61TRG2 engine( with heavy duty air filters) and a Stamford PI734G1 alternator in a 40” container.The generator set was installed at a reverse osmosis water treatment plant in Qatar for feeding the essential load that is required for protecting sensitive equipment of the plant in case of a [...]

Big Projects by Grupel: The Bobo Forro 2 power plant in São Tomé and Principe Islands

The Bobô Forrô 2 power generation central in the islands of São Tomé and Principe was developed in 2015 with the objective of reinforcing the network of energy supply to the country.Grupel supplied 2 diesel generators of 2000 kVA with 1500 RPM with 400V/30kV transformer. An auxiliary container with SCADA system and medium voltage cells together with a complete fuel treatment circuit was also supplied.Resumee:2 diesel generators of 2000 Kva with 1500 RPM with 400V/30kV transformer; Auxiliary container with SCADA [...]

preloader