SUMMARY:
LOCATION
INSTALLED POWER
context of application
ENGINE
ALTERNATOR
Share this on
PROJECT DESCRIPTION
This project had the supply of a three-phase generator, with the power of 100kVA, equipped with Iveco engine and Stamford alternator that is giving support to a Space for Weddings and other group events in the region of Granada in Spain.
The installation of generators in this type of spaces is essential for all events to run smoothly and even if there is a cut in power supply, the event can continue without any limitation. The size of the space to be covered and the equipment connected simultaneously are decisive factors in determining the technical specifications of the generator to be purchased.
This is one of the many projects that Grupel is proud to support in the Spanish Market and that makes our energy every year increasing in this important market.