Angola Acail


Project Description

In an integrated system, this project is contemplated by the supply and assembly of two generators with a power of 1000kVA each, and all the reprogramming of the management and control units of the other generating sets was carried out, as well as synchronizing with the network of mode to run equally in peak shaving.

The customer has an innovative exhaust gas reuse system for the separation of gases and their future use.

Read more about this project on Grupel blog.


preloader