PROJECT DESCRIPTION

Auxiliary emergency systems:

510 kVA generator synchronized with the network in a ISO20 soundproof container with dual redundant power starting system under the REE (Red Electrica EspYearla). A Periodic testing in the load resistor banks of 200 KW was also included (according to project specifications).

Project executed within the Comet Proyect Union (Conexión Mediterranea de Transporte de Alta Tensión) in Spain pensinsular and the Balearic Islands.