GRUPEL

Los Vados WWTP

WWTPs - Water Treatment

SUMMARY:

LOCATION

Spain

INSTALLED POWER

500 + 725 + 1100kVA

context of application

WWTPs - Water Treatment

ENGINE

Grupel

ALTERNATOR

Grupel

Share this on

PROJECT DESCRIPTION

In 2023, one of the projects developed and supplied by Grupel served the Los Vados WWTP in Granada, Spain.

Consisting of 3 generator sets of 500, 725 and 1100kVA, the project operates on standby, coming into operation in the event of a grid failure, guaranteeing power to different parts of the facility.

The generators for the Los Vados WWTP have a Grupel engine and alternator and are equipped with a DeepSea controller, remote start and pumped preheating resistors.

 

At the beginning of 2023, the Los Vados WWTP underwent expansion works, the investment of which amounted to around 28 million euros and which included increasing the plant's capacity threefold - around 72,000 m3/day.

In this way, the renovated infrastructure will be able to respond to the population and structural growth of Granada and its metropolitan area, serving 21 municipalities and, consequently, around half a million inhabitants, after bringing together, for processing and treatment, domestic and industrial wastewater from a large part of the region.

 

In the last 20 years, water consumption has doubled worldwide, making infrastructures such as wastewater treatment plants very important.

That's why Grupel has developed solutions to support these types of facilities all over the world, so that they work properly, ensuring the continuity of all processes and thus avoiding the occurrence of floods and contaminated discharges that would lead to incalculable environmental and financial damage.

 

Grupel’s generators for the Los Vados WWTP provide extra security for the entire facility and its processes, as they guarantee a reliable energy supply even in the event of a failure, breakdown or inclement weather.

Through its engineering team, Grupel is prepared to develop solutions adapted to the different needs of each wastewater treatment plant.

 

See more Grupel projects in this application »

 

ASK FOR MORE INFORMATION

Are you still having doubts about these or other issues regarding power generation? Ask us for clarification or additional information. Our team will reply shortly.
Name*
E-mail*
Phone*
Company*
Address
City*
Country*
VAT Number
Subject*
Other details*

Is there anything else you want to know?

We want this to be a space for guidance and sharing knowledge. Count on us if you need any specific explanation or have any suggestion.